Public roadmap
A path with gates, not promises.
This is the release sequence for yantraOS 2.0. It separates verified Community Edition capabilities from future hosted and marketplace work.
Release roadmap
01 / Public Alpha
AvailableLive image and self-hosted installer
Signed artifacts, local control plane, bounded desktop actions, and the Community Edition installer.
02 / Hosted Runtime
In developmentControl plane and browser experience
Per-user lifecycle, streaming, metering, and billing remain managed-service roadmap work.
03 / Developer platform
PlannedSDK, APIs, and first-party skills
Expand the documented local integration surface without weakening host-owned boundaries.
04 / Public Beta
PlannedHosted Runtime and developer platform
Scale observability, documentation, and the community after the hosted experience has evidence.
05 / Skill Store
PlannedThird-party publishing
Only after sandbox constraints, audit coverage, and remote revocation are demonstrably ready.
06 / yantraOS 2.0
PlannedProduction release
Production readiness, support processes, and the release criteria that follow Beta.
Want to help shape a public capability? Join the GitHub discussions, review the developer guide, or inspect the evidence standard.